Compute that never leaves the country.
Bastion builds small modular data centres on Australian soil — factory-assembled units that arrive complete, rather than one bespoke megaproject built in place. From grid connection to first rack in months, for workloads that are not permitted to go offshore.
A data hall that arrives on a truck.
Each Bastion module is a purpose-built enclosure containing racks, cooling, power distribution, fire suppression and monitoring — assembled and commissioned in the factory, then delivered to a prepared hardstand and connected. No base build, no fit-out, no multi-year construction programme. Capacity is added one module at a time, so the capital follows demand instead of preceding it by three years.
Three standard builds.
Every module ships pre-commissioned with a factory acceptance test certificate. Capacities below are usable IT load at the rack, not gross supply.
| Model | IT load | Racks | Density | Cooling | Footprint | Lead time |
|---|---|---|---|---|---|---|
| B-20 | 250 kW | 8 | 30 kW/rack | Precision air, N+1 | 6.06 × 2.44 m | 10 weeks |
| B-40 | 600 kW | 18 | 35 kW/rack | In-row DX, N+1 | 12.19 × 2.44 m | 14 weeks |
| B-40 HD AI | 1.2 MW | 12 | 100 kW/rack | Direct-to-chip liquid | 12.19 × 2.44 m | 16 weeks |
All builds to AS/NZS 3000 and AS 1668. Fire detection and suppression to AS 1670. Supply arrangements sized with your distributor — Ausgrid, Endeavour Energy, Essential Energy or the relevant DNSP — as part of the site assessment.
Some data is not allowed to leave.
Health records, government workloads, financial data and legal discovery all carry residency obligations that offshore hyperscale capacity cannot satisfy. Bastion exists for that boundary.
Data stays onshore
Every byte is stored and processed within Australian borders. No replication offshore, no foreign subprocessors, no transit through overseas regions.
Hosting Certification Framework
Built to meet Certified Strategic requirements, including ownership and control conditions for whole-of-government workloads.
IRAP to PROTECTED
Facilities assessed by an IRAP assessor against the Information Security Manual, supporting OFFICIAL:Sensitive and PROTECTED classifications.
No foreign control
Australian owned, Australian directors, Australian staff. No foreign ownership interest and no offshore parent with access rights.
Six stages, one contract.
Power availability decides the programme, so it is settled first. Everything after it runs in parallel with fabrication.
Site & power assessment
Available capacity, fibre routes, hardstand condition, planning pathway and an indicative connection cost.
Grid connection
Preliminary enquiry and connection application with your distributor, with an accredited ASP Level 3 designer engaged on the augmentation works.
Fabrication & FAT
Enclosure built, racks and cooling installed, then a witnessed factory acceptance test before anything leaves the floor.
Transport & placement
Delivered by low loader and craned onto the prepared slab. Typically a single day on site.
Energisation
Connection to the customer substation, protection testing, commissioning of cooling and suppression, then load on.
Operate or hand over
Take the keys, or leave it with us under a managed service with 24/7 monitoring and remote hands.
The brand system.
The mark is the plan view of a bastion — the angular projection built into a fortress wall so that every approach is covered. It reads as a technical drawing rather than a shield, which is the point: this is infrastructure, not iconography. The green bar inside it is the module.